Lorem ipsum dolor sit amet, consectetur adipiscing elit. Praesent nec tristique diam. Vestibulum purus urna, dapibus eu hendrerit tristique, hendrerit sit amet dui. Vestibulum ante ipsum primis in faucibus orci luctus et ultrices posuere cubilia Curae; Proin dictum ultrices libero, eu rhoncus velit vulputate sit amet. Duis arcu erat, interdum ut pulvinar quis, faucibus nec mi.
Strebig Construction, Inc. in conjunction with Norfolk Southern architects and our design team completed this NUCOR Pre-Engineered Steel Building facility for the GWSE offices. This building also accommodates a open sided higher bay to service railroad cars. This project can be located on Nelson Road south of the railroad tracks.
Strebig Construction, Inc. has been awarded, has assisted in the design and has negotiated numerous projects for Fort Wayne Community Schools. Each project demonstrates the quality and professionalism that we demand for each of our customers, and that our customers have come to expect.
Strebig Construction, Inc. has been awarded, has assisted in the design, and has negotiated numerous projects for the City of Fort Wayne and the Fort Wayne Parks Department. Each project demonstrates the quality and professionalism that we demand for each of our customers, and that our customers have learned to expect.
Strebig Construction, Inc. has been awarded, has assisted in the design and has negotiated numerous projects for IPFW in Ft Wayne. Each project demonstrates the quality and professionalism that we demand for each of our customers, and that our customers have come to expect.
Strebig Construction Inc. was awarded this Competitive Bid, Plan Spec Commission to complete an adaptive reuse renovation to this two story former medical building. The plans called for complete interior demo and reconstruction, along with an elevator and entry addition as well as a new façade. This fine example of quality construction is located in [...]
Strebig Construction, Inc. was awarded and has completed an unusual adaptive re-use of the former Pep Boys into a retail center located at 422 West Coliseum Blvd. in Fort Wayne, Indiana. This project required the razing of 11 service bays and related foundations and basements to accommodate the newly designed façade. Building sprinkler, and site [...]
Strebig Construction, Inc. in conjunction with our design team built this 13,240 square foot pre-engineered industrial facility for Colormaster located at 810 South Broadway in Butler, Indiana. Several years later S.C.I. negotiated an addition doubling the size of the facility.
Strebig Construction, Inc. was awarded an adaptive re-use project by Allen County to renovate a former credit union bank building into the new Department of Health for the County, located at 4813 New Haven Avenue. The scope entailed complete basement and main floor demolition and reconstruction for clinic labs, exam rooms and offices for staff. [...]
Strebig Construction, Inc. has been awarded, has assisted in the design and has negotiated numerous projects for South West Allen County Schools in Ft Wayne. Each project demonstrates the quality and professionalism that we demand for each of our customers, and that our customers have come to expect.