Category Archives: Featured

  The spec-build for Hilton Downtown Fort Wayne was a sleek design using the existing building’s infrastructure to utilize in the build out of the Starbucks. With the structural steel and concrete exposed it gives this space a very industrial look but also brings a softness with some wood walls, soft lighting, comfortable seating, artwork, […]

This design/build project featured a 20,000 sqft Pre-engineered Nucor building.  The interior buildout included a showroom, conference room, break room, two restrooms and four offices.  The warehouse was designed with a 5 ton crane, wash bay, mechanic service bays, a three bay loading dock, and a mechanical mezzanine.

Strebig Construction, Inc. has been recently awarded renovation contracts for several medical office’s. The scope of work required demolition of existing spaces ranging from 7,200 SF to 5,800 SF. All new insulated interior walls were required to conform to patients HIPAA requirements. The mix of carpet and luxury vinyl tile along with acoustical cloud ceilings […]

The design-build addition for Concordia Lutheran Church and School, known as the “Wolf Arena”, was a combination of conventional steel, pre-engineered steel and masonry structures.  It included a 12,096 SF Nucor pre-engineered metal building section designed for worship, drama, and sporting events. For worship and drama, the arena has a 2,000 SF elevated stage that offers a […]

Strebig Construction Inc. was the successful bidder on this Public Works, competitive bid, wage scale project. Steuben County Aviation Commission navigated a three year long effort to raise the funds to build this State of The Art facility. Completed the fall of 2012, Strebig Construction, Inc. used Nucor pre-engineered steel for the structure and integrated mezzanine. […]