Commercial
Starbucks – Hilton Downtown Fort Wayne
The spec-build for Hilton Downtown Fort Wayne was a sleek design using the existing

Read More....

Design Collaborative
This project was a 10,000 square foot office renovation/expansion project for Design Collaborative, Inc. at their existing office located at 200 East Main Street Suite 600, Fort Wayne, IN 46802. The highlights of this project included

Read More....

Wane-TV
Strebig Construction Inc. was first awarded an entry renovation by WANE TV though a bidding process, as a result of the relationship built around

Read More....

Hull Lift Truck, Inc.
This design/build project featured a 20,000 sqft Pre-engineered Nucor building.  The interior buildout included

Read More....

Concordia Lutheran Church and School
The design-build addition for Concordia Lutheran Church and School, known as the "Wolf Arena", was a combination of conventional steel, pre-engineered steel and masonry structures.  It included a 12,096 SF Nucor pre-engineered metal building section designed for worship, drama, and sporting events. 

Read More....

Central States Beauty Supply
Strebig Construction Inc. was awarded the Design Build Commission to triple the size and recreate the functional warehouse and shipping space at Central States Beauty Supply.

Read More....

SRT Prosthetics & Orthotics
This project was a 10,000 square foot design build project for SRT Prosthetics & Orthotics building their National Prosthetics Center. This project was a complete interior build out of an existing facility at 1900 North Meridian in Indianapolis, Indiana. The highlights of this project included clearing 2 floors completely to bare shell and partial demolition of a basement redesigning the new facility for a complete interior build out.

Read More....

Auer Center
Strebig Construction Inc. was selected by Arts United to do a "Design Build Adaptive Reuse" project at 300 E. Main Street, the Auer Center for Arts and Culture was formerly the NIPSCO Corporate office building. Using creative and innovative think tank efforts with the proposed new occupants of the building along with Jim Sparrow the Executive Director and a great team from Design Collaborative of Fort Wayne we led this project to an on time on budget re-purposing.
Smith Field Airport – New T-Hangar Building
Strebig Construction, Inc. was the successful bidder on this Public Works, competitive bid and wage scale project; the building has 12 units for private owners to house their aircraft.