Industrial
Chicago, Ft Wayne and Eastern (Railamerica) – Locomotive Repair Building
Strebig Construction, Inc. and our design team designed and built this 12,000 square foot Nucor pre-engineered steel building for the inspections and repairs to locomotives and rail cars. This facility was one of the first of their type for Chicago, Fort Wayne and Eastern Railroad.

Read More....

Superior Aluminum Alloys
Strebig Construction, Inc. was awarded a new dust collector building for Superior Aluminum Alloy’s through ETA Engineering, the pre-engineered steel building was NUCOR.
Norfolk Southern
Strebig Construction, Inc. in conjunction with Norfolk Southern architects and our design team completed this NUCOR Pre-Engineered Steel Building facility for the GWSE offices. This building also accommodates a open sided higher bay to service railroad cars. This project can be located on Nelson Road south of the railroad tracks.

Read More.

Colormaster
Strebig Construction, Inc. in conjunction with our design team built this 13,240 square foot pre-engineered industrial facility for Colormaster located at 810 South Broadway in Butler, Indiana. Several years later S.C.I. negotiated an addition doubling the size of the facility.
AEP
Strebig Construction, Inc. in conjunction with AEP and our design team completed this Silver LEED design build adaptive re-use facility for AEP’s Service Center, located at 701 Dayton Street in Decatur, Indiana. This project consisted of a partial demo of the existing building to accommodate a Pre-Engineered NUCOR Steel Building addition, A Pre-Engineered NUCOR Steel Building parking garage and a complete interior demolition and build out for their service center office staff.

Read More...

Univertical Corp.
Strebig Construction, Inc. was awarded and has completed a very unique Design build demolition/re-construction project for Univertical Corp. located at 203 Weatherhead Street in Angola, Indiana. The scope entailed selective demolition of 30,000 square feet of low bay 1950’s conventional post and beam construction and setting in its place a NUCOR pre-engineered structure with 28 foot eaves and 100 foot clear span frames maintaining the integrity of attached adjacent structures on all four sides. Check out our timelapse video of the Univertical demolition/construction.

Read More...